Making every degree
count
Forging takes energy. Our job is to put every kilowatt into the part and measure what remains.
- Solar power plant
- 2,4 MWp
- Report
- Annual, GRI-aligned
- Base year
- 2022
- Target year
- 2030

2025 measurements
−16%CO₂e per tonne, compared with 2022
%98Flash and swarf returned to the steelworks
3,1GWhElectricity generated on the roof
0Metal sent to landfill
2030
targets
Five measured indicators, rather than a single claim. Read it like a report; the same table is updated every year.
| Indicator | 2022 | 2025 | 2030 | Change |
|---|---|---|---|---|
| CO₂e per tonne (Scope 1+2) | 0,62 t | 0,52 t | 0,37 t | −%40 |
| Share of renewable electricity | %18 | %31 | %60 | ×3,3 |
| Flash and swarf recovery | %96 | %98 | %99 | +3 percentage points |
| Process water recycling | %54 | %71 | %90 | +36 percentage points |
| Lost-time injury frequency rate (LTIFR) | 4,1 | 2,6 | <1,0 | −%75 |
01 · Energy
Induction
Induction has replaced gas furnaces: heat is generated inside the part, without heating the hall.
02 · Material
Closed loop
Flash and swarf are sorted by grade and sold back to the same steelworks to become bar stock again.
03 · People
Heat stress
Cooled workstations at the presses and mandatory breaks during hot periods.
Next step
Send your drawing.Feasibility review in 48 hours →
A STEP, IGES or PDF drawing, annual volume and material are all we need. An engineer responds, rather than a sales representative.